Author Topic: When Can We Start Build Dark Rides  (Read 2517 times)

geisterschlosser

  • Newbie
  • *
  • Posts: 12
Re: When Can We Start Build Dark Rides
« Reply #15 on: August 24, 2015, 04:43:19 AM »
Ähm oke, und was ist dann überhaupt denn erlaubt?


abletudu

  • Administrator
  • Hero Member
  • *****
  • Posts: 2806
Re: When Can We Start Build Dark Rides
« Reply #16 on: August 24, 2015, 04:59:09 AM »
"Es ist eine kleine Welt" ist ein Beispiel für einen hell erleuchteten dunkle Fahrt .


Übersetzt mit Google Translate
A Proud Backer Of TPS! If you are having trouble using TPS refer to http://forum.themeparkstudio.com/index.php?board=19.0
To report problems or make suggestions go to https://themeparkstudio.mantishub.com/login_page.php?return=%2Fmy_view_page.php and register for an account.

Xul

  • Full Member
  • ***
  • Posts: 239
Re: When Can We Start Build Dark Rides
« Reply #17 on: August 24, 2015, 07:15:03 AM »
sorry, abletudu. It's much easier to understand your statement when you answer in englisch - even for germans (like me). Don't use the google translator. This tool creates only nonsense...  ;D

@geisterschlosser: wir sollten so fair sein und in einem englisch-sprachigen Forum auch unsere Beiträge in Englisch verfassen. Ich bin da auch nicht so firm drin und vieles wäre viel einfacher, in der Muttersprache zu beschreiben. Aber da es nun mal leider kein Deutsches TPS-Forum (mehr) gibt, bin ich hierher ausgewichen...

abletudu

  • Administrator
  • Hero Member
  • *****
  • Posts: 2806
Re: When Can We Start Build Dark Rides
« Reply #18 on: August 24, 2015, 08:11:20 AM »
Thanks Xul, I try to please,lol!
A Proud Backer Of TPS! If you are having trouble using TPS refer to http://forum.themeparkstudio.com/index.php?board=19.0
To report problems or make suggestions go to https://themeparkstudio.mantishub.com/login_page.php?return=%2Fmy_view_page.php and register for an account.

Mikesch8764

  • Jr. Member
  • **
  • Posts: 52
    • ThemePartStudio meets EuropaPark
Re: When Can We Start Build Dark Rides
« Reply #19 on: August 24, 2015, 11:06:56 AM »
Hello everybody

So to bring a more realistic discussion here into this thread I want to summarize, what "geisterschlosser" asks for:

When can he expect to get an additional coaster, which can be used to build a "themed ride" (lets call it this way)
Most of this coasters are running as an endless coaster with one cabin after the other and at the end building an endless loop, which is running without stopping.

See here this picture which is a theme ride with dinosaur:
http://www.mack-rides.com/upload/Galleries/Dark_Rides/Dark_Ride/dark_rides_4.jpg

In general I also would like to know if it is planned to include more coaster models as in the current phase?

And for the discussion, that no dark rides are allowed here, then please tell me, why this discussion was started then, which is exactly the same topic!
http://forum.themeparkstudio.com/index.php?topic=456.msg6113#msg6113


Best regards
   Michael
« Last Edit: August 24, 2015, 11:10:22 AM by Mikesch8764 »
Theme Park Studio meets Europa Park: http://tps-meets-ep.augusta.de

abletudu

  • Administrator
  • Hero Member
  • *****
  • Posts: 2806
Re: When Can We Start Build Dark Rides
« Reply #20 on: August 24, 2015, 11:42:30 AM »
^ I think part of the reason for this thread is the language barrier, I try to help as best I can, but unfortunately I don't speak German.

Also the referenced thread is not the exact same thing since that was a voting thread and the last post made was
 May 23, 2014 and has been locked.
A Proud Backer Of TPS! If you are having trouble using TPS refer to http://forum.themeparkstudio.com/index.php?board=19.0
To report problems or make suggestions go to https://themeparkstudio.mantishub.com/login_page.php?return=%2Fmy_view_page.php and register for an account.

Mikesch8764

  • Jr. Member
  • **
  • Posts: 52
    • ThemePartStudio meets EuropaPark
Re: When Can We Start Build Dark Rides
« Reply #21 on: August 24, 2015, 12:41:10 PM »
Hi abletudu,

I know you try to help and maybe you know if Pantera is planning to create additional coasters as the ones which are currently in the system. Is there any comment from Pantera, how they plan to continue when the game itself is ready? Including additional coaster types?

Br Michael
Theme Park Studio meets Europa Park: http://tps-meets-ep.augusta.de

Xul

  • Full Member
  • ***
  • Posts: 239
Re: When Can We Start Build Dark Rides
« Reply #22 on: August 24, 2015, 01:05:10 PM »
it's off topic I know, but water rides are also not possible at the moment.
I can't imagine a theme park without dark rides or water rides. I hope, Pantera are of the same opinion and work out coaster types which would make it possible to create dark or water rides. At the moment it's even impossible to create something like a "Wild Mouse" (I hope that is how this coaster type is called in English - a kids mini coaster with narrow curves and almost no curve slope, eg. "Sand Serpent" in Busch Gardens, Florida  ;) ) because those coasters normally have a lot of waggons on the track at the same time. As you know it 's not possible to have more then 3 cars on one track in TPS at one time at the moment. That's definitely not enough for dark rides, water rides and other special types of coasters. That's why I hope they will develop coasters with this features some day.
   
« Last Edit: August 24, 2015, 01:13:32 PM by Xul »

abletudu

  • Administrator
  • Hero Member
  • *****
  • Posts: 2806
Re: When Can We Start Build Dark Rides
« Reply #23 on: August 24, 2015, 04:29:10 PM »
Xul, it is entirely possible to have more than 3 cars. You can have as many cars as will fit in the station as shown in this screenshot where I have 7 cars painted all the colors of the rainbow. I made this by using the Custom Train Builder and the Train Construction Library.



I haven't tried it, but possibly (in theory) you could have a whole string of cars, but you would have to make them as separate trains and use 1 more block segment than number of cars and each track only the length of the car. Of course, this would mean that you would have to make a custom station only as long as the length of your car (if you want something resembloing the omni car). Even if this was possible, so far peeps do not use custom stations, but I am hoping that there will be a way somewhere down the line.
A Proud Backer Of TPS! If you are having trouble using TPS refer to http://forum.themeparkstudio.com/index.php?board=19.0
To report problems or make suggestions go to https://themeparkstudio.mantishub.com/login_page.php?return=%2Fmy_view_page.php and register for an account.

Xul

  • Full Member
  • ***
  • Posts: 239
Re: When Can We Start Build Dark Rides
« Reply #24 on: August 25, 2015, 10:07:27 AM »
what I actually meant is the maximum number of trains. This is limited to 3 per track, no matter how many blocks you have on your coaster track. The same with a custom train coaster I suppose.
At the coaster types I mentioned above, the "Train" normally consist only of one single "car". This can be a car with a single seat, or a "family" car for 2-4 persons or even more. But the total number of "trains" on this coaster should be significantly above 3. Imagine a rapid river ride or a water ride like this with only 3 boats in the river - the waiting period would be unbearable...



This example shows a comparatively small water ride at Germany's "Movie Park" (total length 350 meters, 2 lift hills). But even here there are 8-10 boats running at the same time... 

Another example is this "Wild Mouse" in the same park. You can watch up to 8 cars at the same time on the track and I thing this is not too much...




And in my opinion this is not only typical but necessary for this kind of rollercoasters...
« Last Edit: August 25, 2015, 10:13:29 AM by Xul »

abletudu

  • Administrator
  • Hero Member
  • *****
  • Posts: 2806
Re: When Can We Start Build Dark Rides
« Reply #25 on: August 25, 2015, 10:10:01 AM »
The properties will go higher than 3 trains, but unfortunately it resets to 3. I will contact the developer's and see if that can be changed.
A Proud Backer Of TPS! If you are having trouble using TPS refer to http://forum.themeparkstudio.com/index.php?board=19.0
To report problems or make suggestions go to https://themeparkstudio.mantishub.com/login_page.php?return=%2Fmy_view_page.php and register for an account.

Xul

  • Full Member
  • ***
  • Posts: 239
Re: When Can We Start Build Dark Rides
« Reply #26 on: August 25, 2015, 10:18:22 AM »
Thank you. I'm very excited about the testing results  :)

abletudu

  • Administrator
  • Hero Member
  • *****
  • Posts: 2806
Re: When Can We Start Build Dark Rides
« Reply #27 on: August 25, 2015, 10:29:09 AM »
Information sent, will let you know as soon as I get a reply.
A Proud Backer Of TPS! If you are having trouble using TPS refer to http://forum.themeparkstudio.com/index.php?board=19.0
To report problems or make suggestions go to https://themeparkstudio.mantishub.com/login_page.php?return=%2Fmy_view_page.php and register for an account.

 

SMF 2.0.8 | SMF © 2014, Simple Machines

Page created in 0.565 seconds with 19 queries.

Analysis © 2010 by, Crip
Top