Recent Posts

Pages: [1] 2 3 ... 10
1
Theme Park Studio General Discussion / Re: When will the CD ship
« Last post by abletudu on February 16, 2017, 09:09:04 PM »
The boxed version will ship when the platinum edition is finished. It is in testing right now.
2
Dark Rides Dicussion / Can we get a status update?
« Last post by Dayradon on February 16, 2017, 07:27:36 PM »
Been away for a while (almost a year).  What is the status of Dark rides?  Namely do we have a means yet to create a room that when completely enclosed it is pitch black?  Personally I'd much rather see that implemented than VR support.

When I create a mountain, or space ride (giant box ride like space mountain) I expect it to be dark, and lit with the lighting I implement not be lit up much like it is outside.  Using VR does not improve this situation  The  immersive experience is as much about lighting, props, and set, as it is about the VR aspect.  Any set designer can tell you this and any ride designer at almost every theme park will too.

So how much progress has been made in this area since it was first requested by users?  How much effort (man/hours lets say) has actually been put in? How many in the last year even?
3
Theme Park Studio General Discussion / Re: When will the CD ship
« Last post by Dayradon on February 16, 2017, 07:12:12 PM »
The Cds will be prepared when all updates and bugs have been finished.


2 days short of a year... no cd's.

You do realize that there will never be a time when a program of this size will be bug free?

With the perpetual nature of new hardware (graphics, cpu, sound) drivers (for the afore mentioned), directX/direct3d changes/updates, VisualC library implementation there will always be some bug or another.  Unless you were hoping to put a program that allows you hit a button and it prints 'hello world' to the screen, this  needs to be recognized and accepted. Microsoft, apple, Square enix, EA, Lionhead, the list goes on forever, have way more capital and staff, and content they have produced that is alot older than TPS, still has bugs, and still has new bugs appearing.

Instead of beating around the bush, just put it to rest.

a) there will always be bugs
b) cd's will ship when there are no bugs
c) cd's will never ship.

4
Tutorials and Modeling Discussions / Re: List your workshop additions here!
« Last post by Quentin on February 12, 2017, 11:23:06 PM »
I looooove the Dragon!
5
Theme Park Studio General Discussion / Re: Keep Me In The Loop...
« Last post by abletudu on December 30, 2016, 09:59:54 PM »
You can check this: http://steamcommunity.com/app/254590/discussions/0/152390014787955414/

and http://forum.themeparkstudio.com/index.php?topic=2361.0

Also if you were an original backer of level 5 or better the platinum edition is being worked on.

You should also send an email to support@panteragamestudio.com with the change of address.
6
Theme Park Studio General Discussion / Keep Me In The Loop...
« Last post by Parkman on December 30, 2016, 07:56:22 PM »
Hello!

I am a long time supporter of Theme Park Studio and I have been in the loop about the game from very early on. However, I have take a rather long leave of absence from the game. Regardless, I am back.

So my question is... what exactly have a missed in the past 2 or 3 years? My understanding is that the game is just about ready to be released. Am I correct on this? While it's not exactly the "Summer 2013" release I was anticipating, it's good to see that we're nearing completion. I'm sure the wait will be worth it.

Also, I stopped receiving updates via email. I did change my address so I'm not sure if this has anything to do with it, but I remember each new module had an update with it. If one of the moderators could provide me with a link or message that could help point me in the right direction, I would appreciate that very deeply.
7
Dark Rides Dicussion / Re: Ghost train.
« Last post by Eletigna on December 18, 2016, 11:28:37 AM »
Nadie?  :(
8
Dark Rides Dicussion / Ghost train.
« Last post by Eletigna on December 16, 2016, 10:58:33 AM »
Do you can you tell me if there is a ghost train in the game that have put to the sale in physical format on 25-11-2016?

Thanks.  ;)
9
Theme Park Studio Official Announcements / Re: Update and Launch
« Last post by Paul UK on November 26, 2016, 10:58:09 AM »
Hi Scotty

On Dec 2nd, Theme Park Studio with leave steam early access.
It will then become a stand alone game, (no longer in Beta or Early Access).
10
Theme Park Studio Official Announcements / Re: Update and Launch
« Last post by davaze on November 26, 2016, 04:59:55 AM »
Great News!

Keep up the good work.
Pages: [1] 2 3 ... 10
SMF 2.0.8 | SMF © 2014, Simple Machines

Page created in 0.371 seconds with 17 queries.

Analysis © 2010 by, Crip
Top